Project Introduction:
Comprehensive calorific value of garbage: 1600-1800 kcal
Garbage daily processing capacity: 2800T/D
Installed capacity: 95MW/h
The project adopts a high-efficiency steam turbine generator, saying goodbye to the traditional power generation technology, and under the condition of the same calorific value of garbage, the power generation is larger. At the same time, it is equipped with an advanced environmental protection ventilation system. When the waste gas and waste water discharge standards are met, it also truly realizes a working environment without peculiar smell and odor in the factory area.
All the waste incineration power plants built by Lancheng are equipped with semi-automatic or fully automatic workshops as standard, and a central control hall is set up to maximize the work efficiency and improve safety.
Name: Eric
Mobile:+86 13057338685
Tel:+86 13057338685
Whatsapp:+86 13057338685
Email:707973890@qq.com
Add:No. 331, Chengnan Road, Jiangyin City, Wuxi City, Jiangsu Province, China